Lawson Swim Centre Upgrade
Lawson Swim Centre underwent a major maintenance and an upgrade during a recent winter season. It included replacement of flood lighting, a new filtration plant for the two smaller pools, renewal of pipework, as well as an upgrade of the 50m pool filter.
Align-A-Cut were engaged to complete drilling works in the pool for the new water filtration plant system. Deep sawing was also done to cut away concrete surrounding the filtration pipes so they could be renewed.